The big BIONICO prototype is ready!

125 tubular ceramic supported membranes were connected to dense metallic tubes and welded to the reactor top flange. The prototype will be filled with the catalyst for hydrogen production and it will be integrated in the balance of plant.

Find below nice pictures of the membranes installation!